New Construction Sewer Lateral
February 7, 2020 |

‘The Gables’ New Construction Sewer Lateral

This job is a great representation of what to expect for a new construction sewer lateral installation run from inside the house to the township sewer main. The work was done in one day. Details of the job include:

  • core-drilling through the foundation
  • excavation of the trench from the house to the main
  • installation of pipe at proper grade -fortifying the pipe with stone and necessary transitions with concrete
  • tapping into the sewer main
  • patching and waterproofing the breach in the foundation
  • backfilling, tamping, grading